Biscuit came out of the county shelter at two years old with a good heart and no manners at all. He had been picked up as a stray, so nobody had taught him much of anything. On our first walk around the block he hit the end of the leash so hard I felt it in my shoulder. Twenty-eight years walking a mail route, and I still had a dog I could not walk.
First I tried a retractable leash, like everybody else on my street does. That was a mistake. A retractable leash pays the dog out for pulling. Every time Biscuit lunged, he got more rope, and more rope meant he would lunge again. My wife June watched it for about a week before she said, "You're teaching him to pull." She was right, and it took me a walk to learn it.
That is how I ended up ordering a Hi Kiss Dog Puppy Obedience Recall Training Lead. Fifteen feet long, three quarters of an inch wide, nylon, with a swivel snap on the end. Twenty-two thousand reviews is a lot of people doing the arguing for me, and I have learned to listen to a crowd that size.
The first time I unrolled it in the backyard I felt foolish. Fifteen feet of leash looks like a rope, not like dog equipment. Biscuit took one look at all that slack and trotted off toward the fence like Christmas had come early.
Then I called him. He came. Not because the lead trained him, but because he had fifteen feet of room to turn around in and a pocket full of cut up hot dog waiting for him when he got there. That is the whole trick, and the long lead is what makes the trick possible.
The first week Biscuit came back four times out of ten. By the end of the month it was eight out of ten, and both of the misses were squirrels.
The lead that turned my backyard into a practice field
Fifteen feet of nylon, a swivel snap, and nothing else to figure out. This is the Hi Kiss training lead I used for Biscuit's recall work, and it is the only piece of gear I would buy again without thinking twice.
Amazon Check Today's Price on Amazon →Here is the part I got wrong at the start. I thought a long lead was a leash, and that I would walk him on it. You do not walk a dog on fifteen feet of nylon, or at least I do not. It is for a parking lot, a quiet park, or your own backyard, where you can let him reach the end and then practice turning him around. On the sidewalk he wears a six foot leash, same as always. The long lead is the practice field, not the commute.
The Hi Kiss lead is simple hardware, which is what I wanted. Nylon, so it does not soak up water the way my old cotton one did, and it comes back out of wet grass without turning into a rope of mud. Three quarters of an inch sits in the hand with something to hold on to. The swivel snap keeps the line from twisting up when he circles me twice, which he does every single time.
One thing I did not expect: it is light. Under two ounces, so it does not drag at the snap when Biscuit is standing still, and my arm is not worn out at the end of a session the way it was with heavier line. Small potatoes, but you notice it after a while.
It is not magic and I want to be plain about that. There were three straight days in April when Biscuit would not come back for anything, and I stood in the rain in my own yard holding fifteen feet of wet nylon feeling like a fool. I kept at it because June kept at it, and because the alternative was another year of a dog that could not be off leash anywhere.
What did change, slowly, was how much I trusted him. The lead gave me a way to let go without really letting go. That is where a recall gets built. If the dog never gets a chance to make the choice, he never learns to make it, and if there is nothing holding him, you are only hoping.
We did one group obedience class at the pet store in town. The instructor saw the long lead in my bag and told me to keep using it, that it was the right tool for recall work. That is the only professional advice I have had on this, and it matched what the yard had already taught me.
What I'd Tell You If We Were Sitting at My Kitchen Table
If we were sitting at my kitchen table, with coffee and June listening in, this is what I would tell you. Buy the long lead for one job. Do not buy it to walk the dog, do not buy it to fix a dog, and do not expect it to do anything on its own. Buy it so you have a way to practice come from a distance where the dog can actually fail and try again.
Second thing: keep the sessions short. I do five minutes in the yard, two or three times a day, and I quit while he is still winning. Long sessions make a dog tired and a man frustrated, and a frustrated man yells. I have been that man. The lead does not care how you feel, so keep the practice small enough that you can stay pleasant.
Third, give yourself a season, not a weekend. Biscuit is three years old and we are still working on it. He is a good dog and he is not a trained one, and I have made my peace with the distance between those two things. The Hi Kiss lead helped. It did not finish anything.
Start with five minutes in the yard tonight
You do not need a trainer or a program with a name. You need fifteen feet of slack, a pocket of treats, and a dog who gets the chance to choose you. This is the Hi Kiss lead I used, and it is still in my bag by the door.
Amazon Check Today's Price on Amazon →